BEGIN:VCALENDAR
VERSION:2.0
METHOD:PUBLISH
CALSCALE:GREGORIAN
PRODID:-//WordPress - MECv7.19.0//EN
X-ORIGINAL-URL:https://www.dallasbuilders.org/
X-WR-CALNAME:Dallas Builders Association
X-WR-CALDESC:Dallas Builders Association members have provided our region with safe, affordable and quality housing since 1944.
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-PUBLISHED-TTL:PT1H
X-MS-OLK-FORCEINSPECTOROPEN:TRUE
BEGIN:VEVENT
CLASS:PUBLIC
UID:MEC-ce28c97dcd8381b7d5a093ffd1deae38@dallasbuilders.org
DTSTART:20240829T150000Z
DTEND:20240829T180000Z
DTSTAMP:20240729T153900Z
CREATED:20240729
LAST-MODIFIED:20240814
PRIORITY:5
SEQUENCE:1
TRANSP:OPAQUE
SUMMARY:Wood and Vinyl Flooring Best Practices: Tips from an industry professional – Building a Better House
DESCRIPTION:Hybrid class – In-Person Location: Dallas Builders Association Office (5816 W. Plano Parkway Plano, TX 75093)\nTimothy K McCool, National Wood Flooring Certified Wood Flooring Inspector\nLuxury Vinyl Products Inspector, certified by, IFCII (Institute for Floor Covering Inspectors International)\nLaminate Flooring Inspector, Certified by, NALFA (North American Laminate Flooring Association)\nBest practices for flooring prep and installation for:\nLuxury Vinyl Plank and Tile: Jobsite Readiness, Jobsite Inspection, Moisture Testing, Acclimation Requirements, Substrate Recommendations, Installation Recommendations, Expansion Space Needed, Common Problems seen during an Inspection.\nSolid Wood Flooring: Jobsite Readiness, Jobsite Inspection, Environmental Testing, Moisture Testing, Acclimation Requirements, Substrate Recommendations, Installation Recommendations, Crawlspace -v- Slab-on-Grade or Above, Expansion Space Needed, Seasonal Installation Concerns, Common Problems seen during an Inspection.\nEngineered Wood Flooring: Jobsite Readiness, Jobsite Inspection, Environmental Testing, Moisture Testing, Acclimation Requirements, Substrate Requirements, Installation Recommendations, Crawlspace -v- Slab-on-Grade or Above, Expansion Space Needed, Seasonal Installation Concerns, Common Problems seen during an Inspection.\n \n \n\n
URL:https://www.dallasbuilders.org/events/flooring-best-practices/
CATEGORIES:Board Meetings,Certifications,Continuing Education
LOCATION:5816 W. Plano Pkwy. Plano, TX
ATTACH;FMTTYPE=image/png:https://www.dallasbuilders.org/wp-content/uploads/2024/05/BBH-Banner_new.png
END:VEVENT
END:VCALENDAR
